Around this site

← Back to Jilin

Onshore wind · China

Jilin Tongyu Xinfa wind farm

Under construction200 MWChecked 8 October 2026Last changed in the dataset 15 April 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Jilin Tongyu Xinfa wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
200 MW
Status
Under construction (Construction)
Operator
Jilin Longyuan Wind Power Corp. Ltd.
Owner
State Grid Jilin New Energy Group Co Ltd [18%]; Jiaguan International Co Ltd [15%]; China Longyuan Power Group Corp Ltd [56%]; Xiongya (Virgin) Co Ltd [9%]
Location
Baicheng City, Baicheng, Jilin, China
Phases in the tracker
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Jilin Tongyu Xinfa wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.