Jemmys Carr is a 5 MW solar farm 3.1 km north-east of Formby, Merseyside, United Kingdom. Its planning application (DC/2015/01266) went to Sefton on 3 August 2015 and was granted on 23 September 2016. Construction started on 22 September 2019. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 27 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Jemmys Carr sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school35 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent80 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire82 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Beacons Cross Solar (formerly Jemmys Carr Solar)
Location
Land At Jemmy Carr, Field North Of Downholland Brook, Moss Lane, Formby, Merseyside, L37 0AL, United Kingdom
Planning authority
Sefton
Planning application
DC/2015/01266

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/2015/01266, with what the planning evidence pack adds for this site.

Every application in Sefton · Alerts for applications and incidents near here

  • 3 August 2015 Planning application submitted
  • 23 September 2016 Planning permission granted
  • 22 September 2019 Construction started

None found. The register holds no published incident that names Jemmys Carr. If you know of one, report it (confidential reports are anonymised).

Has Jemmys Carr had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Jemmys Carr; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Jemmys Carr?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 October 2019.
Where is Jemmys Carr?
3.1 km north-east of Formby, Merseyside, United Kingdom (postcode L37 0AL).