← Back to Essex

Energy sites / United Kingdom / Essex

Solar · United Kingdom

Intu Lakeside, West Thurrock Way - Solar Panels

Awaiting Construction1.3 MWChecked 6 October 2026Last changed in the dataset 24 September 2024

Technology
Solar
Capacity
1.3 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Global Mutual
Location
Lakeside Shopping Centre West Thurrock Way West Thurrock, Essex, RM20 2ZP, United Kingdom
Planning authority
Thurrock
Planning application
24/00777/PASOL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 18 July 2024 Planning application submitted
  • 12 September 2024 Planning permission granted

None found. The register holds no published incident that names Intu Lakeside, West Thurrock Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.