Onshore wind · China

Inner Mongolia Uxin Banner (Zhongtian Hechuang) Green Hydrogen wind farm

Planned (permitted)450 MWChecked 8 October 2026Last changed in the dataset 26 July 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Inner Mongolia Uxin Banner (Zhongtian Hechuang) Green Hydrogen wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
450 MW
Status
Planned (permitted) (Pre-construction)
Operator
Zhongtian Hechuang Energy
Owner
Inner Mongolia Manshi Coal Group Co Ltd [10%]; Sinopec Great Wall Energy and Chemical Co Ltd [38%]; China Coal Energy Co Ltd [38%]; Shenergy Co Ltd [12%]
Location
Buridu in Wushenzhao, Ordos Banner, Inner Mongolia, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Uxin Banner (Zhongtian Hechuang) Green Hydrogen wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.