Onshore wind · China

Inner Mongolia Ulanqab (Jingneng) Renewables and Coal Power Integration wind farm

Planned (permitted)1200 MWChecked 8 October 2026Last changed in the dataset 21 August 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Inner Mongolia Ulanqab (Jingneng) Renewables and Coal Power Integration wind farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
1200 MW
Status
Planned (permitted) (Pre-construction)
Owner
Beijing Jingneng Power CO LTD Ulanqab Branch Co; GD POWER Development Co Ltd
Location
Ulanqab, Inner Mongolia, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Ulanqab (Jingneng) Renewables and Coal Power Integration wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.