Onshore wind · China

Inner Mongolia Qahar Right Rear Banner Thermal Power Plant Flexible Operation wind farm

Under construction1018 MWChecked 8 October 2026Last changed in the dataset 7 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Inner Mongolia Qahar Right Rear Banner Thermal Power Plant Flexible Operation wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
1018 MW
Status
Under construction (Construction)
Owner
Inner Mongolia Jingneng Qahar Right Rear Banner New Energy Co Ltd
Location
Ulanqab, Inner Mongolia, China
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Qahar Right Rear Banner Thermal Power Plant Flexible Operation wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.