Onshore wind · China

Inner Mongolia Otog Front Banner Jingxin Coal Power Plant Flexible Operation wind farm

Under construction100 MWChecked 8 October 2026Last changed in the dataset 13 January 2026

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Inner Mongolia Otog Front Banner Jingxin Coal Power Plant Flexible Operation wind farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
100 MW
Status
Under construction (Construction)
Operator
Inner Mongolia Jingneng Shuangxin Power Generation
Owner
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd [4%]; ERDOS Shuangxin Chemical Industry Co Ltd [7%]; Beijing Jingneng POWER Co Ltd [88%]
Location
Ordos, Inner Mongolia, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Otog Front Banner Jingxin Coal Power Plant Flexible Operation wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.