Solar · United Kingdom
Imperial Way, Eagle Business Park - Solar PV System
Operator Quality Fruit and Veg
Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 13 January 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Imperial Way, Eagle Business Park - Solar PV System is a 0.4 MW solar farm on the edge of Yaxley, Cambridgeshire, United Kingdom. Its planning application (24/01813/PSPPA) went to Huntingdonshire on 2 October 2024 and was granted on 22 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Imperial Way, Eagle Business Park - Solar PV System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Imperial Way, Eagle Business Park - Solar PV System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 5.3 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1155 | 2024 | Rooftop solar fire contained on a Peterborough warehouse roof | 5.3 km | Significant |
| EIR-1545 | 2024 | Fire involving solar panels on a building under construction in Kettering | 36 km | Minor |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 40 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Quality Fruit and Veg
- Location
- 11 Imperial Way Eagle Business Park Yaxley, Cambridgeshire, PE7 3GP, United Kingdom
- Planning authority
- Huntingdonshire
- Planning application
- 24/01813/PSPPA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/01813/PSPPA, with what the planning evidence pack adds for this site.
Every application in Huntingdonshire · Alerts for applications and incidents near here
Timeline
- 2 October 2024 Planning application submitted
- 22 November 2024 Planning permission granted
- 22 November 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Imperial Way, Eagle Business Park - Solar PV System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Imperial Way, Eagle Business Park - Solar PV System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Imperial Way, Eagle Business Park - Solar PV System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Imperial Way, Eagle Business Park - Solar PV System?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
- Where is Imperial Way, Eagle Business Park - Solar PV System?
- On the edge of Yaxley, Cambridgeshire, United Kingdom (postcode PE7 3GP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).