Battery storage · United States

Hurteau Solar Project Hybrid

Operator AES Distributed Energy

Operational1.3 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hurteau Solar Project Hybrid is a 1.3 MW battery storage site 4.3 km west of Blackstone, Worcester County, Massachusetts, United States. It first operated in 2020. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 28 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 260 other sites and 245 energy sites within 40 km for Hurteau Solar Project Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (2 MWh)
Capacity
1.3 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
AES Distributed Energy
Owner
AES Distributed Energy
Location
Worcester County, Massachusetts, United States
First operating
2020
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Hurteau Solar Project Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hurteau Solar Project Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hurteau Solar Project Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Hurteau Solar Project Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Hurteau Solar Project Hybrid?
4.3 km west of Blackstone, Worcester County, Massachusetts, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).