Solar · United Kingdom

Horton Wood - Solar park

Operator NextPower Horton Wood Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 11 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Horton Wood - Solar park is a 49.9 MW solar farm 4.2 km east of Swanley, Kent, United Kingdom. Its planning application (22/02599/FUL) went to Sevenoaks on 12 October 2022 and was granted on 17 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 51 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Horton Wood - Solar park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London19 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel23 kmSignificant
EIR-15122024Solar panels involved in fire at school in Carshalton27 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
NextPower Horton Wood Limited
Location
Horton Wood Stack Road Horton Kirby, Kent, DA4 9JE, United Kingdom
Planning authority
Sevenoaks
Planning application
22/02599/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02599/FUL, with what the planning evidence pack adds for this site.

Every application in Sevenoaks · Alerts for applications and incidents near here

  • 12 October 2022 Planning application submitted
  • 17 February 2023 Planning permission granted
  • 17 February 2026 Planning permission expired

None found. The register holds no published incident that names Horton Wood - Solar park. If you know of one, report it (confidential reports are anonymised).

Has Horton Wood - Solar park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Horton Wood - Solar park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Horton Wood - Solar park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 August 2025.
Where is Horton Wood - Solar park?
4.2 km east of Swanley, Kent, United Kingdom (postcode DA4 9JE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).