Solar · United States
Hornet Solar
Operator Hornet Solar LLC
Under construction73 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hornet Solar is a 73 MW solar farm 9.9 km north of Mount Holly, Gaston County, North Carolina, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 6 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Hornet Solar changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hornet Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1458, Fire reported on solar panels at a home in Ballantyne, 40 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1458 | 2026 | Fire reported on solar panels at a home in Ballantyne | 40 km | Minor |
| EIR-1641 | 2026 | Solar panel fire put out on Asheville Chamber of Commerce roof | 140 km | Minor |
| EIR-1094 | 2021 | Solar farm fire in North Carolina reported as under investigation | 183 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 73 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Hornet Solar LLC
- Owner
- Hornet Solar LLC
- Location
- Gaston County, North Carolina, United States
- Expected
- 2026
- Balancing authority
- DUK
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Hornet Solar. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hornet Solar had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hornet Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Hornet Solar?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Hornet Solar?
- 9.9 km north of Mount Holly, Gaston County, North Carolina, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).