Solar · United States
High Noon Solar Energy LLC
Operator Invenergy Services LLC
Under construction300 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
High Noon Solar Energy LLC is a 300 MW solar farm 12 km north of DeForest, Columbia County, Wisconsin, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when High Noon Solar Energy LLC changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Noon Solar Energy LLC sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1443, Solar panel fire on Madison home roof extinguished by firefighters, 31 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1443 | 2024 | Solar panel fire on Madison home roof extinguished by firefighters | 31 km | Minor |
| EIR-1456 | 2026 | Solar panel roof fire at Middleton Operations Center | 32 km | Minor |
| EIR-0318 | 2026 | Brush fire burns grass beneath panels at Wisconsin solar farm | 63 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 300 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Invenergy Services LLC
- Owner
- Invenergy Services LLC
- Location
- Columbia County, Wisconsin, United States
- Expected
- 2027
- Balancing authority
- MISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names High Noon Solar Energy LLC. If you know of one, report it (confidential reports are anonymised).
Questions
- Has High Noon Solar Energy LLC had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names High Noon Solar Energy LLC; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of High Noon Solar Energy LLC?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is High Noon Solar Energy LLC?
- 12 km north of DeForest, Columbia County, Wisconsin, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).