Solar · Denmark
Herning solar project II
Operational17 MWData checked 8 October 2026Source record dated 3 April 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Herning solar project II is a 17 MW solar farm 17 km north-west of Herning, Denmark. It first operated in 2022. Its status in the Global Energy Monitor solar and wind trackers is operational. There are 20 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 0 incidents at solar farms (hybrid battery and solar sites included) in Denmark, and 480 worldwide.
Get an email when Herning solar project II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Denmark. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 17 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Operational (Operating)
- Location
- Herning, Central Denmark Region, Denmark
- First operating
- 2022
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Herning solar project II. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Herning solar project II had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Herning solar project II; it holds 0 incidents at solar farms (hybrid battery and solar sites included) in Denmark.
- What is the status of Herning solar project II?
- Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 3 April 2023.
- Where is Herning solar project II?
- 17 km north-west of Herning, Denmark.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).