← Back to Kentucky
Planning pack for this site, £295Other options

Solar · United States

Henderson County Solar

Operator Stellar Renewable Power

Under construction51.1 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Henderson County Solar is a 51.1 MW solar farm 5 km south-west of Henderson, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Henderson County Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-0438, Solar inverter fire extinguished at solar farm near Robards, Kentucky, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04382025Solar inverter fire extinguished at solar farm near Robards, Kentucky15 kmMinor
EIR-12552025Field fire at solar farm north of Carmi contained to vegetation57 kmMinor
EIR-14612026Residential solar panel fire extinguished in Champaign263 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
51.1 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Stellar Renewable Power
Owner
Stellar Renewable Power
Location
Henderson County, Kentucky, United States
Expected
2027
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Henderson County Solar. If you know of one, report it (confidential reports are anonymised).

Has Henderson County Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Henderson County Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Henderson County Solar?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Henderson County Solar?
5 km south-west of Henderson, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).