Around this site

← Back to Heilongjiang

Onshore wind · China

Heilongjiang Mishan (Bochen) wind farm

Planned (permitted)200 MWChecked 8 October 2026Last changed in the dataset 10 April 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Heilongjiang Mishan (Bochen) wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
200 MW
Status
Planned (permitted) (Pre-construction)
Operator
Mishan Municipality Bochen New Energy
Owner
Ningxia Jiaze New Energy Co Ltd [100%]
Location
Jixi, Heilongjiang, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Heilongjiang Mishan (Bochen) wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.