Solar · United Kingdom
Hedco, Desoto Road - Solar panels
Operator PSD Construct Limtied
Awaiting Construction3.5 MWData checked 16 November 2026Source record dated 8 May 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hedco, Desoto Road - Solar panels is a 3.5 MW solar farm in Widnes, Cheshire, United Kingdom. Its planning application (22/00276/FUL) went to Halton on 27 May 2022 and was granted on 14 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 73 other energy sites within 10 km, 49 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hedco, Desoto Road - Solar panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hedco, Desoto Road - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 22 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 22 km | Significant |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 50 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 53 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- PSD Construct Limtied
- Location
- Hedco Desoto Road Widnes, Cheshire, WA8 0PB, United Kingdom
- Planning authority
- Halton
- Planning application
- 22/00276/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/00276/FUL, with what the planning evidence pack adds for this site.
Every application in Halton · Alerts for applications and incidents near here
Timeline
- 27 May 2022 Planning application submitted
- 14 June 2024 Planning permission granted
- 14 June 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Hedco, Desoto Road - Solar panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hedco, Desoto Road - Solar panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hedco, Desoto Road - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hedco, Desoto Road - Solar panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 May 2026.
- Where is Hedco, Desoto Road - Solar panels?
- In Widnes, Cheshire, United Kingdom (postcode WA8 0PB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).