Around this site

← Back to Hebei

Onshore wind · China

Hebei Hengshui Anping wind farm

Planned (permitted)200 MWChecked 8 October 2026Last changed in the dataset 5 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hebei Hengshui Anping wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
200 MW
Status
Planned (permitted) (Pre-construction)
Operator
Guoneng Hebei New Energy Development
Owner
GD POWER Development Co Ltd [50%]; National Energy Group Hebei Electric Power Co Ltd [50%]
Location
Madian, Hengshui, Hebei, China
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Hebei Hengshui Anping wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.