Battery storage · United Kingdom

Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System)

Operator Welbar Energy Storage Limited & Penso Power (BW ESS) · Owner Welbar Energy Storage Limited

Operational400 MWData checked 16 November 2026Source record dated 9 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System) is a 400 MW battery storage site 5.8 km east of Castle Vale, West Midlands, United Kingdom. Its planning application (PAP/2021/0473) went to North Warwickshire on 5 August 2021 and was granted on 4 March 2022. Construction started on 1 January 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 59 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

760 energy sites within 40 km for Land East and South East of Dunton Hall Battery Storage…

Members see the sites and incidents around this one, and every record behind them.

8 Oct20 Nov
WholesaleBalancing mechanismQuick ReserveDynamic Moderation

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 6,415 MWh out and 7,718 MWh in, active 35% of half hours, peak 52 MW of 400. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

WELBAR ENERGY STORAGE LIMITED (10326869), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational (Under Construction)
Operator or applicant
Welbar Energy Storage Limited & Penso Power (BW ESS)
Owner
Welbar Energy Storage Limited
Location
East & Se/O Dunton Hall, Kingsbury Road, Curdworth, Sutton Coldfield, West Midlands, B76 0BL, United Kingdom
Planning authority
North Warwickshire
Planning application
PAP/2021/0473

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PAP/2021/0473, with what the planning evidence pack adds for this site.

Every application in North Warwickshire · Alerts for applications and incidents near here

  • 5 August 2021 Planning application submitted
  • 4 March 2022 Planning permission granted
  • 1 January 2025 Construction started

None found. The register holds no published incident that names Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 March 2026.
Where is Land East and South East of Dunton Hall Battery Storage (Hams Hall - Battery Energy Storage System)?
5.8 km east of Castle Vale, West Midlands, United Kingdom (postcode B76 0BL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).