Planning pack for this site, £295Other options

Solar · United Kingdom

Hall And Pickles, Wombourne - Solar Panels

Operator Advanced Renewable Power Limited

Awaiting Construction1 MWData checked 16 November 2026Source record dated 1 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hall And Pickles, Wombourne - Solar Panels is a 1 MW solar farm on the edge of Wombourne, West Midlands, United Kingdom. Its planning application (25/00368/OTHERS) went to South Staffordshire on 16 April 2025 and was granted on 9 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 46 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ADVANCED RENEWABLE POWER LTD (07826017), active, since 2011. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hall And Pickles, Wombourne - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college25 kmMinor
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon27 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home28 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Advanced Renewable Power Limited
Location
Hall And Pickles, Richard Hall House, Bridgnorth Road, Wombourne, West Midlands, WV5 0AF, United Kingdom
Planning authority
South Staffordshire
Planning application
25/00368/OTHERS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00368/OTHERS, with what the planning evidence pack adds for this site.

Every application in South Staffordshire · Alerts for applications and incidents near here

  • 16 April 2025 Planning application submitted
  • 9 June 2025 Planning permission granted

None found. The register holds no published incident that names Hall And Pickles, Wombourne - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Hall And Pickles, Wombourne - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hall And Pickles, Wombourne - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hall And Pickles, Wombourne - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
Where is Hall And Pickles, Wombourne - Solar Panels?
On the edge of Wombourne, West Midlands, United Kingdom (postcode WV5 0AF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).