Around this site

← Back to Guizhou

Onshore wind · China

Guizhou Liping Shuikou wind farm

Planned (permitted)100 MWChecked 8 October 2026Last changed in the dataset 7 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Guizhou Liping Shuikou wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
100 MW
Status
Planned (permitted) (Pre-construction)
Operator
China Resources New Energy (Liping) Wind Energy
Owner
China Resources New Energy Third Wind Energy Co Ltd [100%]
Location
Shuikou, Qiandongnan AP, Guizhou, China

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Guizhou Liping Shuikou wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.