Solar · United States
Greer Solar Plant
Operator Greer Solar, LLC
Under construction200 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Greer Solar Plant is a 200 MW solar farm 39 km south-east of Greenville, Washington County, Mississippi, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Greer Solar Plant changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Greer Solar Plant sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1934, Solar inverter fire at Sunflower Solar after an explosion call, 73 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1934 | 2022 | Solar inverter fire at Sunflower Solar after an explosion call | 73 km | Minor |
| EIR-1500 | 2025 | Rooftop solar panels catch fire on a home in Franklin County | 409 km | Minor |
| EIR-1465 | 2025 | Brush fire at FPL solar farm in McDavid | 415 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 200 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Greer Solar, LLC
- Owner
- Greer Solar, LLC
- Location
- Washington County, Mississippi, United States
- Expected
- 2026
- Balancing authority
- MISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Greer Solar Plant. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Greer Solar Plant had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Greer Solar Plant; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Greer Solar Plant?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Greer Solar Plant?
- 39 km south-east of Greenville, Washington County, Mississippi, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).