Solar · United Kingdom
Grafton Underwood
Operator ScottishPower Renewables UK
Awaiting Construction38 MWData checked 16 November 2026Source record dated 28 June 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Grafton Underwood is a 38 MW solar farm 5.9 km north-east of Kettering, Northamptonshire, United Kingdom. Its planning application (KET/2019/0369) went to North Northamptonshire on 19 August 2019 and was granted on 23 September 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 49 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Grafton Underwood changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Grafton Underwood sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1545, Fire involving solar panels on a building under construction in Kettering, 6.0 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1545 | 2024 | Fire involving solar panels on a building under construction in Kettering | 6.0 km | Minor |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 14 km | Significant |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 22 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 38 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- ScottishPower Renewables UK
- Location
- Land to the north west of, Brigstock Road, Grafton Underwood, Kettering, Northamptonshire, NN14 3AB, United Kingdom
- Planning authority
- North Northamptonshire
- Planning application
- KET/2019/0369
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for KET/2019/0369, with what the planning evidence pack adds for this site.
Every application in North Northamptonshire · Alerts for applications and incidents near here
Timeline
- 19 August 2019 Planning application submitted
- 23 September 2020 Planning permission granted
- 23 September 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Grafton Underwood. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Grafton Underwood had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Grafton Underwood; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Grafton Underwood?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 June 2024.
- Where is Grafton Underwood?
- 5.9 km north-east of Kettering, Northamptonshire, United Kingdom (postcode NN14 3AB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).