GMP Solar/Storage-Milton Hybrid

Operator Green Mountain Power Corp · Owner GMP VT Microgrid LLC

Operational2 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

GMP Solar/Storage-Milton Hybrid is a 2 MW battery storage site 5.7 km south-west of Williston, Chittenden County, Vermont, United States. It first operated in 2019. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 9 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 15 other sites and 32 energy sites within 40 km for GMP Solar/Storage-Milton Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (8 MWh)
Capacity
2 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Green Mountain Power Corp
Owner
GMP VT Microgrid LLC
Location
Chittenden County, Vermont, United States
First operating
2019
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names GMP Solar/Storage-Milton Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has GMP Solar/Storage-Milton Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names GMP Solar/Storage-Milton Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of GMP Solar/Storage-Milton Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is GMP Solar/Storage-Milton Hybrid?
5.7 km south-west of Williston, Chittenden County, Vermont, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).