Battery storage · United Kingdom

Gigha Wind Farm Battery Project

Operator Gigha Island community (Multiple Owners)

Decommissioned0.1 MWData checked 16 November 2026Source record dated 17 July 2017

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Gigha Wind Farm Battery Project is a 0.1 MW battery storage site 36 km west of Isle of Arran, Argyll and Bute, United Kingdom. Its planning application went to Argyll and Bute. It has been operating since 15 December 2016. Its status in the Renewable Energy Planning Database (UK government) is decommissioned. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

56 energy sites within 40 km for Gigha Wind Farm Battery Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Decommissioned
Operator or applicant
Gigha Island community (Multiple Owners)
Location
Gigha, Argyll and Bute, PA41 7AB, United Kingdom
Planning authority
Argyll and Bute
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Argyll and Bute · Alerts for applications and incidents near here

  • 15 November 2015 Construction started
  • 15 December 2016 Operational

None found. The register holds no published incident that names Gigha Wind Farm Battery Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gigha Wind Farm Battery Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gigha Wind Farm Battery Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gigha Wind Farm Battery Project?
Decommissioned, in the Renewable Energy Planning Database (UK government), where it last changed on 17 July 2017.
Where is Gigha Wind Farm Battery Project?
36 km west of Isle of Arran, Argyll and Bute, United Kingdom (postcode PA41 7AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).