Planning pack for this site, £295Other options

Battery storage · United Kingdom

Giants Burn Wind Farm -Batter Energy Storage

Operator Statkraft UK Limited · Owner Ministry Of Trade, Industry And Fisheries

Application Submitted23 MWData checked 16 November 2026Source record dated 6 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Giants Burn Wind Farm -Batter Energy Storage is a 23 MW battery storage site 3.3 km north of Dunoon, Argyll and Bute, United Kingdom. Its planning application (ECU00005007) went to Scottish Government (S36) on 15 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 13 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

STATKRAFT UK LTD (05742795), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Giants Burn Wind Farm -Batter Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 315 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool315 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells402 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire513 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
23 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Statkraft UK Limited
Owner
Ministry Of Trade, Industry And Fisheries
Location
2.1 Km Nw/O Dunoon & 1.5 Km Sw/O Sandbank, Dunoon, Argyll and Bute, PA23 8QH, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00005007

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00005007, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 15 July 2025 Planning application submitted

None found. The register holds no published incident that names Giants Burn Wind Farm -Batter Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Giants Burn Wind Farm -Batter Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Giants Burn Wind Farm -Batter Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Giants Burn Wind Farm -Batter Energy Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 6 October 2025.
Where is Giants Burn Wind Farm -Batter Energy Storage?
3.3 km north of Dunoon, Argyll and Bute, United Kingdom (postcode PA23 8QH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).