Battery storage · United Kingdom

Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)

Operator Peak Gen Power · Owner Field Gerrards Cross Ltd

Operational20 MWData checked 16 November 2026Source record dated 12 January 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Field Gerrards Cross (Gerrards Cross Sewage Treatment Works) is a 20 MW battery storage site on the edge of Gerrards Cross, Buckinghamshire, United Kingdom. Its planning application (PL/20/4234/FA) went to Buckinghamshire on 23 December 2020. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 76 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

778 energy sites within 40 km for Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)

Members see the sites and incidents around this one, and every record behind them.

22 Oct20 Nov
WholesaleDynamic ContainmentDynamic ModerationDynamic RegulationBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 221 MWh out and 263 MWh in, active 72% of half hours, peak 9 MW of 20. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £1,833 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

FIELD GERRARDS CROSS LTD (09718112), active, since 2015. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational (Planning Application Submitted)
Operator or applicant
Peak Gen Power
Owner
Field Gerrards Cross Ltd
Location
Gerrards Cross Sewage Treatment Works, Buckinghamshire, SL9 7BE, United Kingdom
Planning authority
Buckinghamshire
Planning application
PL/20/4234/FA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/20/4234/FA, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 23 December 2020 Planning application submitted

None found. The register holds no published incident that names Field Gerrards Cross (Gerrards Cross Sewage Treatment Works). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Field Gerrards Cross (Gerrards Cross Sewage Treatment Works) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Field Gerrards Cross (Gerrards Cross Sewage Treatment Works); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2021.
Where is Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)?
On the edge of Gerrards Cross, Buckinghamshire, United Kingdom (postcode SL9 7BE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).