Battery storage · United Kingdom
Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)
Operator Peak Gen Power · Owner Field Gerrards Cross Ltd
Operational20 MWData checked 16 November 2026Source record dated 12 January 2021
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Field Gerrards Cross (Gerrards Cross Sewage Treatment Works) is a 20 MW battery storage site on the edge of Gerrards Cross, Buckinghamshire, United Kingdom. Its planning application (PL/20/4234/FA) went to Buckinghamshire on 23 December 2020. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 76 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Field Gerrards Cross (Gerrards Cross Sewage Treatment Works) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 7 Nov: 221 MWh out and 263 MWh in, active 72% of half hours, peak 9 MW of 20. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £1,833 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
FIELD GERRARDS CROSS LTD (09718112), active, since 2015. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational (Planning Application Submitted)
- Operator or applicant
- Peak Gen Power
- Owner
- Field Gerrards Cross Ltd
- Location
- Gerrards Cross Sewage Treatment Works, Buckinghamshire, SL9 7BE, United Kingdom
- Planning authority
- Buckinghamshire
- Planning application
- PL/20/4234/FA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PL/20/4234/FA, with what the planning evidence pack adds for this site.
Every application in Buckinghamshire · Alerts for applications and incidents near here
Timeline
- 23 December 2020 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Field Gerrards Cross (Gerrards Cross Sewage Treatment Works). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Field Gerrards Cross (Gerrards Cross Sewage Treatment Works) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Field Gerrards Cross (Gerrards Cross Sewage Treatment Works); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2021.
- Where is Field Gerrards Cross (Gerrards Cross Sewage Treatment Works)?
- On the edge of Gerrards Cross, Buckinghamshire, United Kingdom (postcode SL9 7BE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).