Solar · United Kingdom

GE Healthcare, Pollards Wood - Solar Panels

Operator GE Healthcare

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 12 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

GE Healthcare, Pollards Wood - Solar Panels is a 0.2 MW solar farm on the edge of Chalfont St Giles, Buckinghamshire, United Kingdom. Its planning application (PL/26/01361/PRASP) went to Buckinghamshire on 18 February 2026 and was granted on 13 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for GE Healthcare, Pollards Wood - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End12 kmMinor
EIR-29392026Rooftop solar fire forces West Drayton school to close early18 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford19 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
GE Healthcare
Location
Pollards Wood Nightingales Lane Little Chalfont, Buckinghamshire, HP8 4SP, United Kingdom
Planning authority
Buckinghamshire
Planning application
PL/26/01361/PRASP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/26/01361/PRASP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 18 February 2026 Planning application submitted
  • 13 April 2026 Planning permission granted

None found. The register holds no published incident that names GE Healthcare, Pollards Wood - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has GE Healthcare, Pollards Wood - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names GE Healthcare, Pollards Wood - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of GE Healthcare, Pollards Wood - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
Where is GE Healthcare, Pollards Wood - Solar Panels?
On the edge of Chalfont St Giles, Buckinghamshire, United Kingdom (postcode HP8 4SP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).