Planning pack for this site, £295Other options

Battery storage · United Kingdom

Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 27 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility is a 0.2 MW battery storage site on the edge of Gorseinon, West Glamorgan, United Kingdom. Its planning application (2025/0965/FUL) went to Swansea on 6 May 2025 and was granted on 27 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 62 other energy sites within 10 km, 28 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 110 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter110 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire144 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool206 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Unit 3, Garngoch Industrial Estate, Gorseinon Road, Penllergaer, West Glamorgan, SA4 9WF, United Kingdom
Planning authority
Swansea
Planning application
2025/0965/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2025/0965/FUL, with what the planning evidence pack adds for this site.

Every application in Swansea · Alerts for applications and incidents near here

  • 6 May 2025 Planning application submitted
  • 27 June 2025 Planning permission granted
  • 27 June 2030 Planning permission runs out

None found. The register holds no published incident that names Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2025.
Where is Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility?
On the edge of Gorseinon, West Glamorgan, United Kingdom (postcode SA4 9WF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).