Around this site

← Back to Gansu

Onshore wind · China

Gansu Tengger Desert Renewables Base for Local Use wind farms

Planned (permitted)3000 MWChecked 8 October 2026Last changed in the dataset 8 December 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gansu Tengger Desert Renewables Base for Local Use wind farms sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
3000 MW
Status
Planned (permitted) (Pre-construction)
Operator
Gansu Power Investment Runneng (Wuwei) New Energy
Owner
China Resources Power New Energy Investment Co Ltd [49%]; Gansu Power Investment and Energy Development Co Ltd [51%]
Location
Donghu, Wuwei, Gansu, China
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Gansu Tengger Desert Renewables Base for Local Use wind farms. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.