← Back to Karnataka
Planning pack for this site, £295Other options

Solar · India

Gajendragad hybrid solar farm

Owner Project Ten Renewable Power Pvt Ltd

Under construction225 MWData checked 8 October 2026Source record dated 3 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gajendragad hybrid solar farm is a 225 MW solar farm in Gajendragarh, Karnataka, India. It first operated in 2026. Its status in the Global Energy Monitor solar and wind trackers is under construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 22 incidents at solar farms (hybrid battery and solar sites included) in India, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gajendragad hybrid solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 22 comparable solar incidents in India, nearest first. The nearest is EIR-1480, Fire damages solar panels at Cuddalore power plant, 574 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14802026Fire damages solar panels at Cuddalore power plant574 kmSignificant
EIR-03982025Six workers killed as tower collapses at Avada solar plant in Nagpur657 kmMajor
EIR-15092016Fire damages solar panels at Adani plant in Kamuthi750 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 19 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
225 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Under construction (Construction)
Owner
Project Ten Renewable Power Pvt Ltd
Location
Gajendragad, Karnataka, India
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Gajendragad hybrid solar farm. If you know of one, report it (confidential reports are anonymised).

Has Gajendragad hybrid solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Gajendragad hybrid solar farm; it holds 22 incidents at solar farms (hybrid battery and solar sites included) in India.
What is the status of Gajendragad hybrid solar farm?
Under construction, in the Global Energy Monitor solar and wind trackers, where it last changed on 3 December 2025.
Where is Gajendragad hybrid solar farm?
In Gajendragarh, Karnataka, India.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).