Battery storage · United Kingdom

FRASER (Fraserburgh Development)

Operator Immersa · Owner Fraserburgh Energy Ltd

Planning Permission Expired25 MWData checked 16 November 2026Source record dated 22 January 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

FRASER (Fraserburgh Development) is a 25 MW battery storage site on the edge of Fraserburgh, Aberdeenshire, United Kingdom. Its planning application (APP/2018/0488) went to Aberdeenshire on 16 March 2018 and was granted on 30 May 2018. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 25 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 4 other sites and 154 energy sites within 40 km for FRASER (Fraserburgh Development)

Members see the sites and incidents around this one, and every record behind them.

IMMERSA LIMITED (10124672), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Immersa
Owner
Fraserburgh Energy Ltd
Location
Land To South East Of Hillcres, Fraserburgh, Grampian, Aberdeenshire, AB43 6, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2018/0488

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2018/0488, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 16 March 2018 Planning application submitted
  • 30 May 2018 Planning permission granted

None found. The register holds no published incident that names FRASER (Fraserburgh Development). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has FRASER (Fraserburgh Development) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names FRASER (Fraserburgh Development); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of FRASER (Fraserburgh Development)?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 22 January 2020.
Where is FRASER (Fraserburgh Development)?
On the edge of Fraserburgh, Aberdeenshire, United Kingdom (postcode AB43 6).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).