Battery storage · United Kingdom

Fordtown Energy Storage

Operator Eelpower · Owner Susi Eelpower Fordtown Limited

Operational49.9 MWData checked 16 November 2026Source record dated 23 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Fordtown Energy Storage is a 49.9 MW battery storage site 7 km south of Inverurie, Aberdeenshire, United Kingdom. Its planning application (APP/2020/1673) went to Aberdeenshire on 4 September 2020 and was granted on 24 February 2021. It has been operating since 1 March 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 232 energy sites within 40 km for Fordtown Energy Storage

Members see the sites and incidents around this one, and every record behind them.

SUSI EELPOWER FORDTOWN LIMITED (SC595142), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Eelpower
Owner
Susi Eelpower Fordtown Limited
Location
Fordtown, Kintore, Inverurie, Grampian, Aberdeenshire, AB51 0XJ, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2020/1673
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2020/1673, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Operational on 16 November 2026.

  • 4 September 2020 Planning application submitted
  • 24 February 2021 Planning permission granted
  • 1 March 2025 Operational

None found. The register holds no published incident that names Fordtown Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Fordtown Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fordtown Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fordtown Energy Storage?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Fordtown Energy Storage?
7 km south of Inverurie, Aberdeenshire, United Kingdom (postcode AB51 0XJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).