Solar · United Kingdom

Ford Motor Company Limited - Solar Farm

Operator Onsite Energy Projects Limited

Awaiting Construction1 MWData checked 16 November 2026Source record dated 10 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ford Motor Company Limited - Solar Farm is a 1 MW solar farm on the edge of Daventry, Northamptonshire, United Kingdom. Its planning application (WND/2021/0501) went to West Northamptonshire on 19 August 2021 and was granted on 18 November 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ford Motor Company Limited - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property30 kmSignificant
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough34 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering35 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Onsite Energy Projects Limited
Location
Ford Motor Company Limited, Royal Oak Way South, Daventry, Northamptonshire, NN11 8NT, United Kingdom
Planning authority
West Northamptonshire
Planning application
WND/2021/0501

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WND/2021/0501, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 19 August 2021 Planning application submitted
  • 18 November 2021 Planning permission granted
  • 18 November 2024 Planning permission expired

None found. The register holds no published incident that names Ford Motor Company Limited - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Ford Motor Company Limited - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ford Motor Company Limited - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ford Motor Company Limited - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 December 2021.
Where is Ford Motor Company Limited - Solar Farm?
On the edge of Daventry, Northamptonshire, United Kingdom (postcode NN11 8NT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).