Planning pack for this site, £295Other options

Solar · United Kingdom

Ford Green Trade Centre, Ford Green Road - Solar Panels

Operator Metis Energy Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 27 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ford Green Trade Centre, Ford Green Road - Solar Panels is a 0.3 MW solar farm on the edge of Tunstall, Staffordshire, United Kingdom. Its planning application (25/PRA/00525) went to Stoke-on-Trent on 19 September 2025 and was granted on 29 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 58 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ford Green Trade Centre, Ford Green Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 1.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent1.8 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall3.3 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire27 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Metis Energy Limited
Location
Ford Green Trade Centre, Ford Green Road, Staffordshire, ST6 1NG, United Kingdom
Planning authority
Stoke-on-Trent
Planning application
25/PRA/00525

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/PRA/00525, with what the planning evidence pack adds for this site.

Every application in Stoke-on-Trent · Alerts for applications and incidents near here

  • 19 September 2025 Planning application submitted
  • 29 October 2025 Planning permission granted

None found. The register holds no published incident that names Ford Green Trade Centre, Ford Green Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Ford Green Trade Centre, Ford Green Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ford Green Trade Centre, Ford Green Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ford Green Trade Centre, Ford Green Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2026.
Where is Ford Green Trade Centre, Ford Green Road - Solar Panels?
On the edge of Tunstall, Staffordshire, United Kingdom (postcode ST6 1NG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).