Planning pack for this site, £295Other options

Solar · United Kingdom

First Steps Nursery, Waterloo Road - Solar Panels

Operator Solar Options for Schools Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 15 February 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

First Steps Nursery, Waterloo Road - Solar Panels is a 0.3 MW solar farm in Smethwick, West Midlands, United Kingdom. Its planning application (PD/23/02588) went to Sandwell on 19 December 2023 and was granted on 7 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 131 other energy sites within 10 km, 83 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOLAR OPTIONS FOR SCHOOLS LIMITED (09812345), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for First Steps Nursery, Waterloo Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 7.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college7.8 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home29 kmSignificant
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon43 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Solar Options for Schools Limited
Location
Shireland Collegiate Academy, First Steps Nursery, Waterloo Road, Smethwick, West Midlands, B66 4ND, United Kingdom
Planning authority
Sandwell
Planning application
PD/23/02588

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PD/23/02588, with what the planning evidence pack adds for this site.

Every application in Sandwell · Alerts for applications and incidents near here

  • 7 February 2020 Planning permission expired
  • 19 December 2023 Planning application submitted
  • 7 February 2024 Planning permission granted

None found. The register holds no published incident that names First Steps Nursery, Waterloo Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has First Steps Nursery, Waterloo Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names First Steps Nursery, Waterloo Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of First Steps Nursery, Waterloo Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
Where is First Steps Nursery, Waterloo Road - Solar Panels?
In Smethwick, West Midlands, United Kingdom (postcode B66 4ND).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).