← Back to Norfolk
Planning pack for this site, £295Other options

Solar · United Kingdom

Field Trials Station, Sparrows Hill - Solar Panels

Operator John Innes Centre

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 9 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Field Trials Station, Sparrows Hill - Solar Panels is a 0.3 MW solar farm on the edge of Bowthorpe, Norfolk, United Kingdom. Its planning application (2026/0594) went to South Norfolk on 5 March 2026 and was granted on 8 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Field Trials Station, Sparrows Hill - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2745, Fire at school solar panel convertor in Lowestoft, 43 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27452021Fire at school solar panel convertor in Lowestoft43 kmMinor
EIR-25222021Lowestoft school evacuated after electrical fire involving solar panels43 kmMinor
EIR-28152026Solar panel on school roof starts primary school fire in Ipswich64 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
John Innes Centre
Location
Field Trials Station Sparrows Hill Bawburgh, Norfolk, NR9 3PY, United Kingdom
Planning authority
South Norfolk
Planning application
2026/0594

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2026/0594, with what the planning evidence pack adds for this site.

Every application in South Norfolk · Alerts for applications and incidents near here

  • 5 March 2026 Planning application submitted
  • 8 April 2026 Planning permission granted
  • 8 April 2029 Planning permission runs out

None found. The register holds no published incident that names Field Trials Station, Sparrows Hill - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Field Trials Station, Sparrows Hill - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Field Trials Station, Sparrows Hill - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Field Trials Station, Sparrows Hill - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2026.
Where is Field Trials Station, Sparrows Hill - Solar Panels?
On the edge of Bowthorpe, Norfolk, United Kingdom (postcode NR9 3PY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).