Under Construction49.9 MWData checked 16 November 2026Source record dated 29 July 2022
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Ferrymuir is a 49.9 MW battery storage site in Cupar, Fife, United Kingdom. Its planning application (19/02750/FULL) went to Fife on 23 September 2019 and was granted on 10 January 2020. Construction started on 29 July 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 11 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Ferrymuir changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ferrymuir sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 325 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 325 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 375 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 516 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Gore Street Energy Storage Fund
- Location
- Land west of Ferrymuir, South of Westfield Road, Cupar, Fife, KY15 5AP, United Kingdom
- Planning authority
- Fife
- Planning application
- 19/02750/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/02750/FULL, with what the planning evidence pack adds for this site.
Every application in Fife · Alerts for applications and incidents near here
Timeline
- 23 September 2019 Planning application submitted
- 10 January 2020 Planning permission granted
- 29 July 2022 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Ferrymuir. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Ferrymuir had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ferrymuir; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ferrymuir?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2022.
- Where is Ferrymuir?
- In Cupar, Fife, United Kingdom (postcode KY15 5AP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).