← Back to Warwickshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Feldon Vale Solar Farm

Operator Low Carbon Limited · Owner Low Carbon Holdco Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 24 February 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Feldon Vale Solar Farm is a 49.9 MW solar farm 6.8 km south-west of Southam, Warwickshire, United Kingdom. Its planning application (20/02839/FUL) went to Stratford-on-Avon on 12 October 2020 and was granted on appeal on 1 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 36 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

LOW CARBON LIMITED (13356797), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Feldon Vale Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college42 kmMinor
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property46 kmSignificant
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough51 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Low Carbon Limited
Owner
Low Carbon Holdco Limited
Location
Knightcote Lane, Warwickshire, CV47, United Kingdom
Planning authority
Stratford-on-Avon
Planning application
20/02839/FUL
Appeal reference
APP/J3720/W/22/3292579

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/02839/FUL, with what the planning evidence pack adds for this site.

Every application in Stratford-on-Avon · Alerts for applications and incidents near here

  • 12 October 2020 Planning application submitted
  • 13 August 2021 Planning permission granted
  • 11 February 2022 Appeal lodged
  • 1 December 2022 Appeal granted
  • 1 December 2025 Planning permission expired

None found. The register holds no published incident that names Feldon Vale Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Feldon Vale Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Feldon Vale Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Feldon Vale Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2021.
Where is Feldon Vale Solar Farm?
6.8 km south-west of Southam, Warwickshire, United Kingdom (postcode CV47).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).