Solar · France

Exploitation Nord TotalEnergies

Operational4 MWData checked 19 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Exploitation Nord TotalEnergies is a 4 MW solar farm 3.3 km north-west of Vesoul, Pusey, Haute-Saône, Bourgogne-Franche-Comté, France. It first operated in 2022. Its status in the Registre national des installations (ODRE, France) is operational. There are 3 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 11 incidents at solar farms (hybrid battery and solar sites included) in France, and 480 worldwide.

30 energy sites within 40 km for Exploitation Nord TotalEnergies

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4 MW
Capacity figure from
Registre national des installations (ODRE, France)
Status
Operational (En service)
Location
Pusey, Haute-Saône, Bourgogne-Franche-Comté, France
First operating
2022
Network operator
Enedis

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 11 October 2022 Connected to the grid
  • 11 October 2022 Operational

None found. The register holds no published incident that names Exploitation Nord TotalEnergies. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Exploitation Nord TotalEnergies had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Exploitation Nord TotalEnergies; it holds 11 incidents at solar farms (hybrid battery and solar sites included) in France.
What is the status of Exploitation Nord TotalEnergies?
Operational, in the Registre national des installations (ODRE, France).
Where is Exploitation Nord TotalEnergies?
3.3 km north-west of Vesoul, Pusey, Haute-Saône, Bourgogne-Franche-Comté, France.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).