Solar · United Kingdom
Exeter City Council - Solar Panel Array
Operator Exeter City Council
Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 16 November 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Exeter City Council - Solar Panel Array is a 1.2 MW solar farm on the edge of Exeter, Devon, United Kingdom. Its planning application (19/0458/ECC) went to Exeter on 10 September 2019 and was granted on 29 October 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Exeter City Council - Solar Panel Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Exeter City Council - Solar Panel Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1486, Fire under solar panels at Broadclyst brought under control, 8.6 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1486 | 2026 | Fire under solar panels at Broadclyst brought under control | 8.6 km | Significant |
| EIR-1523 | 2026 | Fire damages solar panel batteries in a Teignmouth garage | 17 km | Minor |
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 19 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Exeter City Council
- Location
- Exeter City Council, Canal Banks, Green Waste Facility, Exeter, Devon, EX2 8DX, United Kingdom
- Planning authority
- Exeter
- Planning application
- 19/0458/ECC
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/0458/ECC, with what the planning evidence pack adds for this site.
Every application in Exeter · Alerts for applications and incidents near here
Timeline
- 10 September 2019 Planning application submitted
- 29 October 2019 Planning permission granted
- 29 October 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Exeter City Council - Solar Panel Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Exeter City Council - Solar Panel Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Exeter City Council - Solar Panel Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Exeter City Council - Solar Panel Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2021.
- Where is Exeter City Council - Solar Panel Array?
- On the edge of Exeter, Devon, United Kingdom (postcode EX2 8DX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).