← Back to Middlesex
Planning pack for this site, £295Other options

Solar · United Kingdom

Enfield County School For Girls, Holly Walk - Solar Panels

Operator Power Up North London

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 25 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Enfield County School For Girls, Holly Walk - Solar Panels is a 0.2 MW solar farm in Enfield Town, Middlesex, United Kingdom. Its planning application (26/02025/PRV) went to Enfield on 14 May 2026 and was granted on 23 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 48 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Enfield County School For Girls, Holly Walk - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 3.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected3.9 kmMinor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley17 kmSignificant
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London22 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Power Up North London
Location
Enfield County School For Girls Holly Walk, Middlesex, EN2 6QG, United Kingdom
Planning authority
Enfield
Planning application
26/02025/PRV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/02025/PRV, with what the planning evidence pack adds for this site.

Every application in Enfield · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 14 May 2026 Planning application submitted
  • 23 July 2026 Planning permission granted

None found. The register holds no published incident that names Enfield County School For Girls, Holly Walk - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Enfield County School For Girls, Holly Walk - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Enfield County School For Girls, Holly Walk - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Enfield County School For Girls, Holly Walk - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Enfield County School For Girls, Holly Walk - Solar Panels?
In Enfield Town, Middlesex, United Kingdom (postcode EN2 6QG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).