Battery storage · United Kingdom
Energy Centre Royal Mint
Operator Infinite Energy Renewables
Operational20 MWData checked 16 November 2026Source record dated 1 August 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Energy Centre Royal Mint is a 20 MW battery storage site on the edge of Llantrisant, Rhondda Cynon Taff, United Kingdom. Its planning application (19/1007/10) went to Rhondda Cynon Taf on 23 September 2019 and was granted on 22 January 2020. It has been operating since 1 August 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 43 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Energy Centre Royal Mint changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with fossil fuel plant)
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Infinite Energy Renewables
- Location
- Royal Mint, Llantrisant, Pontyclun, Mid Glamorgan, Rhondda Cynon Taff, CF72 8YT, United Kingdom
- Planning authority
- Rhondda Cynon Taf
- Planning application
- 19/1007/10
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/1007/10, with what the planning evidence pack adds for this site.
Every application in Rhondda Cynon Taf · Alerts for applications and incidents near here
Timeline
- 23 September 2019 Planning application submitted
- 22 January 2020 Planning permission granted
- 1 May 2022 Construction started
- 1 August 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Energy Centre Royal Mint. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Energy Centre Royal Mint had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Energy Centre Royal Mint; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Energy Centre Royal Mint?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 August 2023.
- Where is Energy Centre Royal Mint?
- On the edge of Llantrisant, Rhondda Cynon Taff, United Kingdom (postcode CF72 8YT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).