Solar · Germany
Elmenhorst
Operator ENERPARC Solar Invest 169 GmbH
Planned13 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Elmenhorst is a 13 MW solar farm 9.7 km south of Stralsund, Elmenhorst, Vorpommern-Rügen, Mecklenburg-Vorpommern, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 38 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany, and 480 worldwide.
Get an email when Elmenhorst changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Elmenhorst sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 8 comparable solar incidents in Germany, nearest first. The nearest is EIR-2998, Solar panel system burns on roof of Werneuchen house, 181 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2998 | 2026 | Solar panel system burns on roof of Werneuchen house | 181 km | Significant |
| EIR-2879 | 2026 | Fire at German home with photovoltaic roof tiles injures firefighter | 404 km | Significant |
| EIR-2629 | 2024 | Fire breaks out in technical room of Hesse solar park | 459 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 13 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- ENERPARC Solar Invest 169 GmbH
- Location
- Elmenhorst, Vorpommern-Rügen, Mecklenburg-Vorpommern, 18510, Germany
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Elmenhorst. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Elmenhorst had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Elmenhorst; it holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany.
- What is the status of Elmenhorst?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Elmenhorst?
- 9.7 km south of Stralsund, Elmenhorst, Vorpommern-Rügen, Mecklenburg-Vorpommern, Germany (postcode 18510).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).