← Back to Texas
Planning pack for this site, £295Other options

Solar · United States

El Patrimonio

Operator Heritage Solar LLC

Planned150 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

El Patrimonio is a 150 MW solar farm 20 km south of San Antonio, Bexar County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 5 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for El Patrimonio sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1643, Brush fire near solar farm started by grass cutting, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16432025Brush fire near solar farm started by grass cutting21 kmMinor
EIR-07332026Rooftop solar fire prompts evacuation at Niagara Bottling plant in Seguin, Texas64 kmSignificant
EIR-14132016Solar panel fire prompts brief evacuation at Apple campus in Austin136 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
150 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Heritage Solar LLC
Owner
Heritage Solar LLC
Location
Bexar County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names El Patrimonio. If you know of one, report it (confidential reports are anonymised).

Has El Patrimonio had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names El Patrimonio; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of El Patrimonio?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is El Patrimonio?
20 km south of San Antonio, Bexar County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).