Solar · United Kingdom
Eastfields Farm, Deppers Bridge - Solar Farm
Operator Vantage RE
Under Construction34.8 MWData checked 16 November 2026Source record dated 20 May 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Eastfields Farm, Deppers Bridge - Solar Farm is a 34.8 MW solar farm 3.1 km south-west of Southam, Warwickshire, United Kingdom. Its planning application (21/02448/FUL) went to Stratford-on-Avon on 29 July 2021 and was granted on 26 August 2021. Construction started on 1 November 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 41 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Eastfields Farm, Deppers Bridge - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
VANTAGE RE LTD. (11023558), active, since 2017. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Eastfields Farm, Deppers Bridge - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 39 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 39 km | Minor |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 43 km | Significant |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 50 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 34.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Vantage RE
- Location
- Eastfields Farm Deppers Bridge Southam, Warwickshire, CV47 2SU, United Kingdom
- Planning authority
- Stratford-on-Avon
- Planning application
- 21/02448/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/02448/FUL, with what the planning evidence pack adds for this site.
Every application in Stratford-on-Avon · Alerts for applications and incidents near here
Timeline
- 29 July 2021 Planning application submitted
- 26 August 2021 Planning permission granted
- 1 November 2023 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Eastfields Farm, Deppers Bridge - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Eastfields Farm, Deppers Bridge - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Eastfields Farm, Deppers Bridge - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Eastfields Farm, Deppers Bridge - Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2024.
- Where is Eastfields Farm, Deppers Bridge - Solar Farm?
- 3.1 km south-west of Southam, Warwickshire, United Kingdom (postcode CV47 2SU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).