Battery storage · United Kingdom

Eastcroft Municipal Depot

Operator Nottingham City Council

Operational0.6 MWData checked 16 November 2026Source record dated 20 March 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Eastcroft Municipal Depot is a 0.6 MW battery storage site in Nottingham, United Kingdom. Its planning application went to Nottingham. It has been operating since 20 March 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 81 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 2 other sites and 651 energy sites within 40 km for Eastcroft Municipal Depot

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Nottingham City Council
Location
Municipal Depot, Eastcroft , Nottingham, Nottinghamshire, NG2 3JH, United Kingdom
Planning authority
Nottingham
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Nottingham · Alerts for applications and incidents near here

  • 20 March 2023 Operational

None found. The register holds no published incident that names Eastcroft Municipal Depot. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Eastcroft Municipal Depot had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Eastcroft Municipal Depot; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Eastcroft Municipal Depot?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 March 2023.
Where is Eastcroft Municipal Depot?
In Nottingham, United Kingdom (postcode NG2 3JH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).