East Kilbride - Battery storage

Operator Engie Regeneration Limited

Operational49.9 MWData checked 16 November 2026Source record dated 13 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

East Kilbride - Battery storage is a 49.9 MW battery storage site 27 km north of Locharbriggs, Lanarkshire, United Kingdom. Its planning application (P/22/0472) went to South Lanarkshire on 28 March 2022 and was granted on 22 August 2022. It has been operating since 23 July 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 160 energy sites within 40 km for East Kilbride - Battery storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Engie Regeneration Limited
Location
North E/O East Kilbride, 275kv Grid Substation, Cairnmuir Road, East Kilbride, Moffat, Lanarkshire, DG10, United Kingdom
Planning authority
South Lanarkshire
Planning application
P/22/0472
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/22/0472, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

Status changed from Under Construction to Operational on 16 November 2026.

  • 28 March 2022 Planning application submitted
  • 22 August 2022 Planning permission granted
  • 1 May 2024 Construction started
  • 23 July 2026 Operational

None found. The register holds no published incident that names East Kilbride - Battery storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has East Kilbride - Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names East Kilbride - Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of East Kilbride - Battery storage?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is East Kilbride - Battery storage?
27 km north of Locharbriggs, Lanarkshire, United Kingdom (postcode DG10).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).