Solar · United Kingdom

East Haddon - Solar Photovoltaic System

Operator HW Brown

Under Construction2 MWData checked 16 November 2026Source record dated 8 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

East Haddon - Solar Photovoltaic System is a 2 MW solar farm 9.2 km west of Brixworth, Northamptonshire, United Kingdom. Its planning application (WND/2022/0447) went to West Northamptonshire on 30 May 2022 and was granted on 30 September 2022. Construction started on 1 October 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 29 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for East Haddon - Solar Photovoltaic System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property21 kmSignificant
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough23 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering23 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
HW Brown
Location
West Haddon Road, East Haddon, Northamptonshire, NN6 8FB, United Kingdom
Planning authority
West Northamptonshire
Planning application
WND/2022/0447

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WND/2022/0447, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 30 May 2022 Planning application submitted
  • 30 September 2022 Planning permission granted
  • 1 October 2023 Construction started

None found. The register holds no published incident that names East Haddon - Solar Photovoltaic System. If you know of one, report it (confidential reports are anonymised).

Has East Haddon - Solar Photovoltaic System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names East Haddon - Solar Photovoltaic System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of East Haddon - Solar Photovoltaic System?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2024.
Where is East Haddon - Solar Photovoltaic System?
9.2 km west of Brixworth, Northamptonshire, United Kingdom (postcode NN6 8FB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).