← Back to Tyne And Wear

Energy sites / United Kingdom / Tyne And Wear

Solar · United Kingdom

Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic

Awaiting Construction0.2 MWChecked 6 October 2026Last changed in the dataset 20 May 2025

Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gateshead Metropolitan Borough Council
Location
Dunston Leisure Centre, Dunston Bank, Dunston Hill, Gateshead, Tyne And Wear, NE11 9PY, United Kingdom
Planning authority
Gateshead
Planning application
DC/24/01084/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 14 January 2025 Planning application submitted
  • 23 April 2025 Planning permission granted
  • 23 April 2050 Planning permission expired

None found. The register holds no published incident that names Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.