Solar · United Kingdom
Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic
Operator Gateshead Metropolitan Borough Council
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 20 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic is a 0.2 MW solar farm on the edge of Whickham, Tyne And Wear, United Kingdom. Its planning application (DC/24/01084/FUL) went to Gateshead on 14 January 2025 and was granted on 23 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 93 other energy sites within 10 km, 74 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 16 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1499 | 2025 | Solar panels linked to fires at council buildings in Northumberland | 16 km | Significant |
| EIR-2721 | 2025 | Solar panel fire breaks out at Shanklea Primary School | 16 km | Significant |
| EIR-1502 | 2025 | Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre | 37 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Gateshead Metropolitan Borough Council
- Location
- Dunston Leisure Centre, Dunston Bank, Dunston Hill, Gateshead, Tyne And Wear, NE11 9PY, United Kingdom
- Planning authority
- Gateshead
- Planning application
- DC/24/01084/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/24/01084/FUL, with what the planning evidence pack adds for this site.
Every application in Gateshead · Alerts for applications and incidents near here
Timeline
- 14 January 2025 Planning application submitted
- 23 April 2025 Planning permission granted
- 23 April 2050 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2025.
- Where is Dunston Leisure Centre, Dunston Bank - Solar Photovoltaic?
- On the edge of Whickham, Tyne And Wear, United Kingdom (postcode NE11 9PY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).