Battery storage · United Kingdom
Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate)
Operator JLEN Environmental Assets Group · Owner Susi Eelpower Dunsinane Limited
Operational49.9 MWData checked 16 November 2026Source record dated 16 May 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate) is a 49.9 MW battery storage site on the edge of Dundee, Tayside, United Kingdom. Its planning application (19/00876/FULL) went to Dundee City on 2 December 2019 and was granted on 18 February 2022. It has been operating since 3 May 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
A day out costs this site about £17,271 at its earnings over the last 31 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
Satellite heat detections at this site
1 heat detection within 1.5 km of this site on NASA's fire satellites, 20 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.
Source: NASA FIRMS (LANCE), VIIRS. Read each morning.
The company behind this site
SUSI EELPOWER DUNSINANE LIMITED (12356110), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- JLEN Environmental Assets Group
- Owner
- Susi Eelpower Dunsinane Limited
- Location
- Land To The W/O Kinnoull Stree, Dunsinane Avenue, Dunsinane Industrial Estate, Dundee, Tayside, Tayside, DD2 3QT, United Kingdom
- Planning authority
- Dundee City
- Planning application
- 19/00876/FULL
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/00876/FULL, with what the planning evidence pack adds for this site.
Every application in Dundee City · Alerts for applications and incidents near here
Timeline
- 2 December 2019 Planning application submitted
- 18 February 2022 Planning permission granted
- 3 May 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 May 2023.
- Where is Land Off Dunsinane Avenue Battery Storage (Dunsinane Industrial Estate)?
- On the edge of Dundee, Tayside, United Kingdom (postcode DD2 3QT).